-
Montgomery Bell Pro Shop
The old clubhouse at Montgomery Bell State Park was torn down to make room for more than 13,000 square feet
in an expanded, brand new clubhouse, pro‐shop, and restrooms. The structure consists of structural concrete and
wood framing and post tension concrete slab with metal studs. The exterior features stone veneer, hardy board
siding, and a metal roof. The expansive covered veranda consists of structural concrete. The new clubhouse features
a snack bar, complete commercial kitchen, cart storage space, carpet and VCT flooring, and upgraded millwork
items, such as window and door casings.
-
MTSU Dairy Farm
The new MTSU Dairy Farm, located on over 400 acres on Guy James Road in Murfreesboro,
consists of a 20,000 square foot milking and housing facility supported by a 9,000 square
foot farm maintenance shop, a 5,500 square foot hay barn, a 1,300 square foot , six bay
commodity barn, two 4,000 bushel grain bins, and a new 2,700 foot concrete road to access
the new barn.
The dairy’s features include a cow hospital and working facility, a double-eight parallel milking
parlor with rapid-exit gates that can milk 16 cows at a time and a computer-controlled
milking system with individual cow-ID and cow-activity measurements, real-time milk
weights ,and milk-quality measurements. The milking system includes an in-line heat exchanger
to precool the milk to 58 degrees before it enters a 2,000-gallon bulk tank, that further
cools the milk to 38 degrees. The milking parlor is also flushed with a deck spray and
two 750 gallon flush tanks that utilize the spent water from the heat exchanger to irrigate
crops raised to feed the cows.
-
Nelson Mazda
Located in the heart of downtown Nashville, the old, 86,000 square foot Nissan Hippodrome building
has been renovated as the new home of Nelson Mazda. Nelson Mazda has been granted a new exterior
façade featuring metal panels, EFIS, new storefront glass, and Jewell Box on the upper level for car
display.
The dealership is comprised of 13,000 square feet of offices, service area, and showroom on the main
level; 11,200 square feet of service parking and wash bays on the upper level; and a 49,200 square
foot basement that will house a parts warehouse and car display lot. In addition, the facility has
received complete HVAC and electrical upgrades, as well as additional plumbing for added restrooms,
and new elevators. A brand new, 48’x30’ service center features state of the art service bays and a service
drive canopy.
-
Arrington Vineyards
HCCI performed a complete renovation of a 60 year old house into a retail store, wine tasting bar, and office space. Renovation included extensive specialty millwork, stone exterior to replace existing brick, a 12 foot wide wood deck enclosing three sides of building, and a stained concrete patio on bottom level.
-
Creekside Plaza
An existing 20,000 SF warehouse and skate center was converted into a retail center for a bank, hardware store, and restaurant. The primary features of work include: new facade for existing structure, sitework, utilities, sidewalks, paving, parking lot expansion, landscaping and irrigation, grease traps and water quality unit, parking lot striping, new concrete pads, and dumpster enclosure.
-
CVS
HCCI has performed work as a Preferred Contractor for over one hundred CVS Pharmacy stores throughout the Southeastern region, including North Carolina, Florida, Mississippi, Louisiana, Tennessee, and Texas. Most prototypical stores have been approximately 13,000 square feet. In addition to Preferred Contractor status, Owen Hardcastle was recognized as a Hurricane Hero for HCCI’s recovery work performed after the devastation of hurricane Katrina.
-
Governor's Square Mall
Governor's Square Mall
-
Marangoni Tread
Marangoni Tread
-
Courtyard by Marriott
Courtyard by Marriott in Goodlettsville consists of new construction of a seventy-four thousand square foot, four-story, one-hundred and twenty room hotel on a seven acre site. The structure is wood with a wood frame elevator shaft and wood frame stairwells; thin brick and EFIS exterior; EDPM roof. The hotel features the latest Marriott prototype design, indoor pool, and conference center. Interior finishes include carpet, VCT, and ceramic tile flooring; granite and marble countertops; wood veneer in lobby; and knockdown wall texture in guestrooms.
-
Red Mountain Bank
Red Mountain Bank was converted from an existing dry cleaning facility into a high-end banking center utilizing the design-build approach under a tight time frame of three months. Renovation included complete gutting of the structure, new roof installation, new MEP, new parking lot, new high-end interior spaces, and new storefront systems. Additionally, construction entailed coordination of non-traditional, high-tech banking systems and drive thru equipment.
-
Serra Honda
Work performed on Serra Honda consisted of a complete renovation of an existing facility, including office area, new showroom, and service area for a total of 60,000 square feet. Construction also included new epoxy floor systems throughout, overhead door systems, and entry drive systems into show room and service area, block construction and exterior brick veneer. Additionally, construction included vehicle exhaust systems, installation of vehicle service equipment, new electrical, and locker room with shower facilities.
-
Shapiro Family Chiropractic & Wellness / Sips n Strokes
HCCI performed the simultaneous interior build out of two tenant spaces in the same shopping center ranging from 1600 to 2100 square feet in size. Work included new concrete floor in rear of space where new plumbing utilities where installed. Complete interior build out consisted of new framing and drywall, new Mechanical, Plumbing, and electrical,new interior finishes such as Carpet, VCT, painting, millwork, acoustical ceiling, and base.
|